Pumping the foundation walls (1)
Pumping the foundation walls (1)
Foundation Step Footings
Foundation Step Footings
Foundation Footings Excavation
Foundation Footings Excavation
Foundation Footings (1)
Foundation Footings (1)
Foundation Footing Form Boards
Foundation Footing Form Boards
Foundation Set
Foundation Set
Walls Arrive Tarped for shipping
Walls Arrive Tarped for shipping
Interior walls set in living room
Interior walls set in living room
1st wall is set at 9am
1st wall is set at 9am
10 min. later 2nd wall set
10 min. later 2nd wall set
Exterior walls with windows and siding pre-installed
Exterior walls with windows and siding pre-installed
House Walls
House Walls
Living Room Wall
Living Room Wall
Garage Wall
Garage Wall
2 hrs after setting the 1st exterior wall
2 hrs after setting the 1st exterior wall
Trusses Arrive
Trusses Arrive
Roof Truss Set
Roof Truss Set
Roof Truss With Siding Pre-Installed
Roof Truss With Siding Pre-Installed
Gable Truss
Gable Truss
Trusses Going in
Trusses Going in
12 Hours After Setting the 1st Exterior Wall
12 Hours After Setting the 1st Exterior Wall
3 weeks after house roof sheeting in place, wall and floor insulation complete
3 weeks after house roof sheeting in place, wall and floor insulation complete
3 weeks after house roof sheeting in place, Rough plumbing, electrical, HVAC complete
3 weeks after house roof sheeting in place, Rough plumbing, electrical, HVAC complete
3 weeks after house roof sheeting in place, Roofing done
3 weeks after house roof sheeting in place, Roofing done
3.5 weeks after house roof sheeting in place. Customer caulking, getting ready for painting
3.5 weeks after house roof sheeting in place. Customer caulking, getting ready for painting
Crawl space with pony wall
Crawl space with pony wall
Sheetrock hanging
Sheetrock hanging
Sheetrocking
Sheetrocking
Front Elevation - freshly painted
Front Elevation - freshly painted