Getting ready for the foundation
Getting ready for the foundation
Footings poured, foundation walls being formed. Concrete blankets to keep the concrete from freezing
Footings poured, foundation walls being formed. Concrete blankets to keep the concrete from freezing
Trusses arrive
Trusses arrive
House walls arrive Day 1
House walls arrive Day 1
Interior walls with double top plates pre-installed
Interior walls with double top plates pre-installed
Bedroom wall
Bedroom wall
Garage wall goes in
Garage wall goes in
3.5 hours after walls arrive. All exterior and interior walls in place.
3.5 hours after walls arrive. All exterior and interior walls in place.
Vaulted trusses
Vaulted trusses
Trusses being crane set
Trusses being crane set
12 ft double patio sliding glass door looking at their view of snow capped Squaw Butte Mountain
12 ft double patio sliding glass door looking at their view of snow capped Squaw Butte Mountain
Front elevaton 12 hours after 1st exterior wall crane set
Front elevaton 12 hours after 1st exterior wall crane set
Front elevation looking from the South East
Front elevation looking from the South East
Roofing installed 16 days after roof sheeting in place. Rough plumbing complete. Rough wiring and HVAC started
Roofing installed 16 days after roof sheeting in place. Rough plumbing complete. Rough wiring and HVAC started
Rear elevation with 12 x 70 ft covered rear patio 12 hrs from set of first wall
Rear elevation with 12 x 70 ft covered rear patio 12 hrs from set of first wall
Great Room and kitchen. 9 ft walls. Windows pre-installed at the factory and shipped in the walls
Great Room and kitchen. 9 ft walls. Windows pre-installed at the factory and shipped in the walls
Insulated and getting ready for sheetrock 4 weeks after house set
Insulated and getting ready for sheetrock 4 weeks after house set
Sheetrock hung, ready for tape and texture, 5 weeks from house set
Sheetrock hung, ready for tape and texture, 5 weeks from house set
12 x 70 ft covered rear patio. Soffit material being installed. Getting ready for paint
12 x 70 ft covered rear patio. Soffit material being installed. Getting ready for paint
Cherry Lane, Emmett, ID - Rear Elevation
Cherry Lane, Emmett, ID - Rear Elevation
Extra Large Pantry
Extra Large Pantry
Powder Room
Powder Room
Sheetrock finished, cabinets installed, interior trim, getting ready for customer to install Luxury Vinyl Flooring.
Sheetrock finished, cabinets installed, interior trim, getting ready for customer to install Luxury Vinyl Flooring.
Living Room
Living Room
Kitchen with Viking Appliances-Hood
Kitchen with Viking Appliances-Hood
Master Vanity
Master Vanity
Master Shower Glass wall and door
Master Shower Glass wall and door
Cherry Lane, Emmett, ID - Left Side View
Cherry Lane, Emmett, ID - Left Side View
Custom - Cherry Lane, Emmett, ID - Winter Rye Grass
Custom - Cherry Lane, Emmett, ID - Winter Rye Grass
"We have moved in."
"We have moved in."