1. Foundation Footings in place, 36 inch stemwalls being formed
2. Foundation Poured
3. Getting ready to pour the concrete slabs
4. Concrete slabs poured and saw cut (1)
5. Drilling the water well
6. Instaling the Subfloor ahead of the house package delivery
7. Set Day. the house walls arrive on site.
8. Roof Trusses arrive onsite
9. House walls begin to be set by a 30 ton crane. Windows and siding are factory pre-installed
10. Garage wall for a two car garage. Continous Glu Lam Beam Header
11. Two and a half hours later, all exterior walls are in place. Interior walls are being set at the same time
12. All exterior and interior walls in place. Getting ready for roof trusses.
13. Roof Trusses
14. Roof Trusses
15. Rear Covered Patio Roof Trusses. This covered patio is vaulted
16. All interior walls pre-built and in place
17 Gable Truss being set
18 Finishing the roof trusses
19. 7 hours from the set of the first wall
20. 2 and Half days from first walls set. Front Elevation. Roof drysheeting in place
Front Elevation, 3 weeks from House Set, Ready for roofing, painting, Plumbing and electrical done
Rear Elevation 3 weeks from House Set
24. Prep for sidewalks
25. Pouring the front parking pad
25A. Coated septic tank being installed
26. Pine ceiling on rear patio
27. Rear Elevation from the NE Corner
28. Rear elevation from the SE corner
Mill Road, Emmett ID
30. Sheetrocked, ready to tape and texture
31. 1,160 SF completely finished garage
32.Pine ceiling in Living Room, move in day
33. Move in day looking at the kitchen from the LR
Snow Has Arrived 1 Week After We Moved In