1. Foundation and subfloor are in place, walls begin to be set
2. Walls continue
3. Walls and trusses. Custom Windows to be field installed. This custom drafted home, set Sept. 2023 in Swan Springs Sub.
4. Gable Truss being set. Walls come with building wrap in place
5. This Great Room has Parallel Cord Trusses 2 ft deep
6. Roof Sheeting in place
7. Ice and water shield and roof drysheeting being installed
8. Front Elevation. Custom windows installed. Siding going on
9. Rear Elevation (1)
10. Interior. Ceiling insulated and zero clearance fireplace installed
11. Interior looking at front gable
12. Interior wall insulation going in. Rough plumbing, electrical and HVAC complete
I3. Roofing in place, siding going on. Front elevation
14. Rear Elevation